Contractors and equipment will be in the park beginning April 1st 2019 and will work until May long weekend. Works will halt for the summer and resume in the fall.
Upgrades to the Mt. Fernie Park road including widening the section of road through the campground and raising the road elevation at the Stove Creek crossing will be undertaken over the next month and will result in disruption to traffic flow. Traffic controllers will be utilized for safety and to minimize the closure times.
Several areas of the park which were closed in the fall will remain closed during construction including the Gorby parking lot, the campground and the last section of Hedonism trail.
Works scheduled for the fall will include asphalt, road line painting and installation of safety features and works at the park entrance.